What is a "paso a nivel"?
Why
A paso a nivel is a crossing at the same level between a road and a railway line on its own track bed. If the road goes over a bridge, there is no paso a nivel. And a level crossing of two roads is an intersección, not a paso a nivel.
Legal basis: LSV Anexo I, 64
The same question in Spanish (if you take the exam in Spanish)
¿Qué es un paso a nivel?
- Un puente que permite a la carretera pasar por encima de la línea de ferrocarril.
- El cruce a la misma altura de una vía con un ferrocarril de plataforma independiente.
- El cruce a la misma altura de dos carreteras.
Share:
← Previous questionNext question →
More questions from this lesson
- For traffic purposes, what determines the point where a built-up area begins?
- You pass the end-of-built-up-area sign and carry on along a conventional road. What general speed limit now applies to your car?
- You have just passed the built-up area entry sign. From what point must you follow the built-up area rules?
- One street joins another at the same level, forming a "T", without crossing it. Is it an intersección?
- A road crosses a railway line by going over a bridge above the tracks. Is there a paso a nivel there?
- For traffic purposes, what is a "poblado"?
An original Drive Mundo question, written from the traffic rules. Not an official DGT question.